ESS Docs Document 342-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

A Safety Overview of the HIE-ISOLDE Project

Document #:
ESS-doc-342-v1
Document type:
Presentation Slides
Submitted by:
Georg Hulla
Updated by:
Georg Hulla
Document Created:
28 Oct 2014, 17:41
Contents Revised:
28 Oct 2014, 17:41
DB Info Revised:
28 Oct 2014, 17:41
Viewable by:
  • Public document
Modifiable by:
Abstract:
The High Intensity and Energy (HIE)-ISOLDE project involves building a new LINAC and two new service buildings, to run the future accelerator. This upgrade will bring new technologies and new features to ISOLDE that requires new safety developments.
The technical safety soluIons idenIfied for the project were discussed amongst the different work packages concerned and CERN HSE (Health, Safety and Environmental protecIon unit). Different risk analysis and models were used to validate the safety approach such as:
FLUKA simulaIon to validate the LINAC shielding (Acknowledgement S.Giron DGS/RP)
CFD ComputaIonal Fluid Dynamics to idenIfy ODH and cold burn hazards inside LINAC
(Acknowledgement E.Da Riva EN/CV)
IMMI - The Noise Mapping SoXware to assess noise impact of the project

The presentaIon will describe a brief descripIon of these hazards (cryogenic, noise, pressure equipment...), the methodology and the selected technical soluIons.
Authors:
Keywords:
HIE-ISOLDE
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.10, contact Document Database Administrators